Skip to content
  • https://www.facebook.com/
  • https://twitter.com/
  • https://t.me/
  • https://www.instagram.com/
  • https://youtube.com/
SolarScope India SolarScope India SolarScope India

Digital Media & News for Renewable Energy

SolarScope India SolarScope India SolarScope India

Digital Media & News for Renewable Energy

  • Home
  • About us
  • Contact us
  • Event Calendar
  • Magazine

Menu

  • Energy Storage
  • Green Hydrogen & Green Ammonia
  • Renewable Energy
  • Wind Power
  • Solar Manufacturing
  • Solar PV
  • Sustainable Transport
  • Power Transmission & Grid
  • Appointments
  • Investment
  • Certifications
  • Business
  • Government Policies
  • Tender
  • Instagram
  • Facebook
  • LinkedIn
  • Link
  • Home
  • About us
  • Contact us
  • Event Calendar
  • Magazine
Close

Search

Home/News/Energy Storage/ACME Solar Commissions 53.63 MW / 300 MWh BESS Phase-I in Rajasthan
3233a1d7 f23d 4eda 9d5d 0e343d0b5d26
Energy Storage

ACME Solar Commissions 53.63 MW / 300 MWh BESS Phase-I in Rajasthan

By SolarScope India
September 15, 2026 1 Min Read
0

ACME Solar Holdings Limited has commissioned Phase-I of the Battery Energy Storage System (BESS) component of its Firm and Dispatchable Renewable Energy (FDRE) project in Rajasthan.

The commissioned BESS has a capacity of 53.63 MW / 300 MWh and is located at Village Kelan, Tehsil Chhatargarh, in Bikaner district. The project has been commissioned through ACME Greentech Seventh Private Limited, a wholly owned subsidiary of ACME Solar Holdings.

The Phase-I BESS was commissioned on September 14, 2026, and its Commercial Operation Date (COD) is scheduled for September 16, 2026.

The BESS forms part of a larger 300 MW / 1,581 MWh FDRE project being developed by the company. At present, only the BESS component has been commissioned, while the corresponding renewable energy generation component of the project remains under development.

The commissioning adds to ACME Solar’s growing portfolio of energy storage projects and supports the company’s focus on developing firm and dispatchable renewable power capacity in India.

Author

SolarScope India

Follow Me
Other Articles
img 8024
Previous

Premier Energies and RCT India Sign Pact for 12 GWh BESS Manufacturing Facility in Telangana

58647d89 fccf 4af1 b770 3c6803030d4b
Next

Yash Highvoltage Signs Three-Year Representation Agreement in the US

Recent Posts

  • Sembcorp Green Infra Receives SEBI Approval for ₹3,750 Crore IPO
  • Resonia Unveils New Vision, Targets ₹1 Lakh Crore Asset Portfolio by FY32
  • Advait Battery Ecosystem Appoints Bhushan Shahane as Chief Operating Officer
  • Tata Power Renewable Energy Commissions 100.8 MW Wind Project in Maharashtra
  • RERC Approves Five-Year PPA Extensions for Two 1.25 MW Wind Projects in Rajasthan at ₹2.44 per Unit
  • KKR Makes Minority Investment in Gentari’s 8 GW Renewable Energy Platform in India
  • Juniper Green Energy Commissions 108.50 MWp Solar Capacity and 94.77 MWh BESS
  • ACME Solar Signs PPA for 220 MW Solar + BESS Project at Morena Solar Park in Madhya Pradesh
  • Waaree Transpower Secures Transformer Order Worth Over ₹100 Crore from NTPC
  • Orient Green Power to Recover ₹12.98 Crore Following Favourable APTEL Order
Copyright 2026 — SolarScope India. All rights reserved. SolarScope India.