Skip to content
  • https://www.facebook.com/
  • https://twitter.com/
  • https://t.me/
  • https://www.instagram.com/
  • https://youtube.com/
SolarScope India SolarScope India SolarScope India

Digital Media & News for Renewable Energy

SolarScope India SolarScope India SolarScope India

Digital Media & News for Renewable Energy

  • Home
  • About us
  • Contact us
  • Event Calendar
  • Magazine

Menu

  • Energy Storage
  • Green Hydrogen & Green Ammonia
  • Renewable Energy
  • Wind Power
  • Solar Manufacturing
  • Solar PV
  • Sustainable Transport
  • Power Transmission & Grid
  • Appointments
  • Investment
  • Certifications
  • Business
  • Government Policies
  • Tender
  • Instagram
  • Facebook
  • LinkedIn
  • Link
  • Home
  • About us
  • Contact us
  • Event Calendar
  • Magazine
Close

Search

Home/News/Business/Net Meter Shortage Stalls Rooftop Solar Installations Across Telangana
img 9564
Business

Net Meter Shortage Stalls Rooftop Solar Installations Across Telangana

By SolarScope India
November 19, 2026 1 Min Read
0

Rooftop solar installations across Telangana are facing delays due to a shortage of three-phase net meters, leaving several completed solar power systems unable to connect to the electricity grid.

Solar vendors have reportedly been making repeated visits to distribution company offices to obtain meters, while several installed rooftop solar systems remain idle. The delay is affecting consumers and solar developers financially, as completed installations cannot begin supplying electricity to the grid.

The shortage has resurfaced after limited stocks of three-phase net meters were exhausted. Around 2,000 pending meter requirements were cleared following subsequent supplies, but the availability of three-phase meters has once again become a concern.

Officials of Telangana Southern Power Distribution Company Limited (TGSPDCL) stated that 8,900 single-phase net meters are currently available, while another 4,000 meters are expected to arrive after Diwali.

According to TGSPDCL, the supply disruption is linked to a global shortage of electronic printed circuit board (PCB) components, which has affected manufacturers’ ability to meet delivery schedules. The utility had earlier placed orders for 15,000 net meters, of which 7,000 were received in August.

The shortage is affecting residential, commercial and industrial rooftop solar installations across the state.

Burra Ashok Kumar Goud, President of the Telangana Solar Energy Association, highlighted that consumer interest in rooftop solar remains strong, but delays in meter availability are preventing completed projects from becoming operational.

The situation highlights the importance of timely metering infrastructure in supporting rooftop solar adoption and ensuring effective grid integration of distributed renewable energy.

Author

SolarScope India

Follow Me
Other Articles
img 9563
Previous

Adani Group Appoints Prerak Thekadi as Vice President – Chief Commercial Officer for BESS, Hydrogen and Electrolyser Business

img 9565 1
Next

SWELECT Energy Secures ₹1,400 Crore Solar EPC Projects, Builds 750 MW Module Order Pipeline in Q2 FY27

Recent Posts

  • Sembcorp Green Infra Receives SEBI Approval for ₹3,750 Crore IPO
  • Resonia Unveils New Vision, Targets ₹1 Lakh Crore Asset Portfolio by FY32
  • Advait Battery Ecosystem Appoints Bhushan Shahane as Chief Operating Officer
  • Tata Power Renewable Energy Commissions 100.8 MW Wind Project in Maharashtra
  • RERC Approves Five-Year PPA Extensions for Two 1.25 MW Wind Projects in Rajasthan at ₹2.44 per Unit
  • KKR Makes Minority Investment in Gentari’s 8 GW Renewable Energy Platform in India
  • Juniper Green Energy Commissions 108.50 MWp Solar Capacity and 94.77 MWh BESS
  • ACME Solar Signs PPA for 220 MW Solar + BESS Project at Morena Solar Park in Madhya Pradesh
  • Waaree Transpower Secures Transformer Order Worth Over ₹100 Crore from NTPC
  • Orient Green Power to Recover ₹12.98 Crore Following Favourable APTEL Order
Copyright 2026 — SolarScope India. All rights reserved. SolarScope India.