Skip to content
  • https://www.facebook.com/
  • https://twitter.com/
  • https://t.me/
  • https://www.instagram.com/
  • https://youtube.com/
SolarScope India SolarScope India SolarScope India

Digital Media & News for Renewable Energy

SolarScope India SolarScope India SolarScope India

Digital Media & News for Renewable Energy

  • Home
  • About us
  • Contact us
  • Event Calendar
  • Magazine

Menu

  • Energy Storage
  • Green Hydrogen & Green Ammonia
  • Renewable Energy
  • Wind Power
  • Solar Manufacturing
  • Solar PV
  • Sustainable Transport
  • Power Transmission & Grid
  • Appointments
  • Investment
  • Certifications
  • Business
  • Government Policies
  • Tender
  • Instagram
  • Facebook
  • LinkedIn
  • Link
  • Home
  • About us
  • Contact us
  • Event Calendar
  • Magazine
Close

Search

Home/News/Energy Storage/MNRE Mandates India-Based Inverter Data Storage for PM Surya Ghar Rooftop Solar Systems
img 7351
Energy StorageNews

MNRE Mandates India-Based Inverter Data Storage for PM Surya Ghar Rooftop Solar Systems

By SolarScope India
August 22, 2026 1 Min Read
0

The Ministry of New and Renewable Energy (MNRE) has mandated that inverter-level data from rooftop solar systems installed under the PM Surya Ghar: Muft Bijli Yojana must be stored exclusively on servers or cloud platforms located within India. The new requirement also mandates daily solar generation reporting to the National Portal through a standardised API. 

Under the directive, inverter OEMs and manufacturers must ensure that applications, monitoring and control servers, and real-time rooftop solar data are maintained in an encrypted, secure and protected environment within India. OEMs must submit compliance confirmation to REC, with a copy to MNRE, within 30 days. Non-compliance could prevent manufacturers from installing systems under the PM Surya Ghar programme. 

The move is aimed at strengthening data security, improving programme monitoring and addressing cybersecurity concerns associated with transmitting rooftop solar data to overseas servers. MNRE has also directed manufacturers to include data loggers within inverter warranty coverage. 

Daily generation data will be linked to an inverter serial number or another unique identifier and transmitted through a uniform API using only the minimum required parameters. The arrangement will continue until state governments or DISCOMs establish systems to capture and supply rooftop solar generation data to the National Portal. 

Key Highlights

🇮🇳 Inverter-level data to be stored within India
🔒 Focus on secure and encrypted data infrastructure
📊 Daily generation reporting mandated through a standardised API
⏳ 30 days for OEMs to submit compliance confirmation
⚠️ Non-compliance may restrict participation in PM Surya Ghar installations
☀️ Strengthens cybersecurity and monitoring of India’s rooftop solar programme

Author

SolarScope India

Follow Me
Other Articles
img 7350
Previous

BPE Steps Up Push for India-Made Energy Storage Solutions on Akshay Urja Diwas

img 7352
Next

Pace Digitek Secures ₹92.93 Crore Kalpa Power Order for 100 MWh BESS Project

Recent Posts

  • REMONDIS Aqua India Secures Water Treatment Package for Celloraa Energy’s 1.2 GW Solar Cell Facility in Gujarat
  • Ajay Jain Appointed Vice President at Siemens Energy India Limited
  • InSolare Secures EPC Order for 13.2 MWp Solar Project with 7.5 MWh BESS
  • Adani Enterprises and Jabil Sign Agreement for Proposed AI and Data Centre Equipment JV in India
  • CEA Releases 2026 Manual on Transmission Planning Criteria
  • ACME Solar Signs 300 MW Power Supply Agreement with SECI at ₹6 per Unit
  • Chennai Port Authority Invites Bids for 2 MW Rooftop Solar Project
  • Avaada Group Plans ₹40,000 Crore Investment in Green Ammonia and Methanol Projects
  • Greenzo Energy Raises ₹130 Crore, Valued at ₹1,030 Crore
  • Jindal Stainless Deploys Electric Trucks for the First Time, Strengthening Green Mobility
Copyright 2026 — SolarScope India. All rights reserved. SolarScope India.