Skip to content
  • https://www.facebook.com/
  • https://twitter.com/
  • https://t.me/
  • https://www.instagram.com/
  • https://youtube.com/
SolarScope India SolarScope India SolarScope India

Digital Media & News for Renewable Energy

SolarScope India SolarScope India SolarScope India

Digital Media & News for Renewable Energy

  • Home
  • About us
  • Contact us
  • Event Calendar
  • Magazine

Menu

  • Energy Storage
  • Green Hydrogen & Green Ammonia
  • Renewable Energy
  • Wind Power
  • Solar Manufacturing
  • Solar PV
  • Sustainable Transport
  • Power Transmission & Grid
  • Appointments
  • Investment
  • Certifications
  • Business
  • Government Policies
  • Tender
  • Instagram
  • Facebook
  • LinkedIn
  • Link
  • Home
  • About us
  • Contact us
  • Event Calendar
  • Magazine
Close

Search

Home/News/Solar PV/NIRL–NCRTC Renewables to Develop 110 MW Solar Power Project in Uttar Pradesh
img 7174
Solar PV

NIRL–NCRTC Renewables to Develop 110 MW Solar Power Project in Uttar Pradesh

By SolarScope India
August 11, 2026 1 Min Read
0

NIRL–NCRTC Renewables Limited, a joint venture between NLC India Renewables Limited (NIRL) and the National Capital Region Transport Corporation (NCRTC), is set to develop a 110 MW (AC) grid-connected solar PV project in Uttar Pradesh.

The project follows NCRTC’s award for the development of the solar project under captive mode. Power generated from the project is planned to be supplied under a 25-year Power Purchase Agreement (PPA), with the full project capacity scheduled to commence supply within 24 months of the PPA’s effective date. 

The joint venture, incorporated in May 2026, has an equity structure of 74% for NIRL and 26% for NCRTC. The project marks another step in NLC India’s renewable energy expansion and NCRTC’s efforts to support clean-power infrastructure. 

Key Highlights

  • Project Capacity: 110 MW (AC)
  • Technology: Grid-connected Solar PV
  • Location: Uttar Pradesh
  • Developer: NIRL–NCRTC Renewables Ltd.
  • Partners: NLC India Renewables & NCRTC
  • Mode: Captive
  • PPA Tenure: 25 years
  • Execution Timeline: 24 months
Author

SolarScope India

Follow Me
Other Articles
img 7172
Previous

Websol Energy Q1FY27 Revenue Surges 70% to ₹372.6 Crore; Prepaid Entire IREDA Term Loan

img 7175 4
Next

Waaree Renewable Technologies Secures 124 MWp Solar EPC Project

Recent Posts

  • REMONDIS Aqua India Secures Water Treatment Package for Celloraa Energy’s 1.2 GW Solar Cell Facility in Gujarat
  • Ajay Jain Appointed Vice President at Siemens Energy India Limited
  • InSolare Secures EPC Order for 13.2 MWp Solar Project with 7.5 MWh BESS
  • Adani Enterprises and Jabil Sign Agreement for Proposed AI and Data Centre Equipment JV in India
  • CEA Releases 2026 Manual on Transmission Planning Criteria
  • ACME Solar Signs 300 MW Power Supply Agreement with SECI at ₹6 per Unit
  • Chennai Port Authority Invites Bids for 2 MW Rooftop Solar Project
  • Avaada Group Plans ₹40,000 Crore Investment in Green Ammonia and Methanol Projects
  • Greenzo Energy Raises ₹130 Crore, Valued at ₹1,030 Crore
  • Jindal Stainless Deploys Electric Trucks for the First Time, Strengthening Green Mobility
Copyright 2026 — SolarScope India. All rights reserved. SolarScope India.