Skip to content
  • https://www.facebook.com/
  • https://twitter.com/
  • https://t.me/
  • https://www.instagram.com/
  • https://youtube.com/
SolarScope India SolarScope India SolarScope India

Digital Media & News for Renewable Energy

SolarScope India SolarScope India SolarScope India

Digital Media & News for Renewable Energy

  • Home
  • About us
  • Contact us
  • Event Calendar
  • Magazine

Menu

  • Energy Storage
  • Green Hydrogen & Green Ammonia
  • Renewable Energy
  • Wind Power
  • Solar Manufacturing
  • Solar PV
  • Sustainable Transport
  • Power Transmission & Grid
  • Appointments
  • Investment
  • Certifications
  • Business
  • Government Policies
  • Tender
  • Instagram
  • Facebook
  • LinkedIn
  • Link
  • Home
  • About us
  • Contact us
  • Event Calendar
  • Magazine
Close

Search

Home/News/Wind Power/Onix Renewable Strengthens Safety Practices at 54 MW Wind Project
img 8049
Wind Power

Onix Renewable Strengthens Safety Practices at 54 MW Wind Project

By SolarScope India
September 16, 2026 1 Min Read
0

Onix Renewable is reinforcing on-site safety practices at its 54 MW Wind Project in Western Gujarat through focused Toolbox Talk (TBT) sessions.

The sessions cover key areas including workplace precautions, emergency awareness, manual handling practices, and effective use of Personal Protective Equipment (PPE).

The initiative highlights Onix Renewable’s focus on maintaining strong safety standards alongside disciplined project execution as it advances its renewable energy projects.

Author

SolarScope India

Follow Me
Other Articles
img 8045
Previous

Datta Power Infra Charges 15.5 km, 220 kV Transmission Line in Rajasthan

f5bf9a2c 1dea 4e5e 9acb 703ee373252d
Next

Vikram Solar Signs 1 GW Domestic Cell Supply Agreement with Avaada Electro

Recent Posts

  • Sembcorp Green Infra Receives SEBI Approval for ₹3,750 Crore IPO
  • Resonia Unveils New Vision, Targets ₹1 Lakh Crore Asset Portfolio by FY32
  • Advait Battery Ecosystem Appoints Bhushan Shahane as Chief Operating Officer
  • Tata Power Renewable Energy Commissions 100.8 MW Wind Project in Maharashtra
  • RERC Approves Five-Year PPA Extensions for Two 1.25 MW Wind Projects in Rajasthan at ₹2.44 per Unit
  • KKR Makes Minority Investment in Gentari’s 8 GW Renewable Energy Platform in India
  • Juniper Green Energy Commissions 108.50 MWp Solar Capacity and 94.77 MWh BESS
  • ACME Solar Signs PPA for 220 MW Solar + BESS Project at Morena Solar Park in Madhya Pradesh
  • Waaree Transpower Secures Transformer Order Worth Over ₹100 Crore from NTPC
  • Orient Green Power to Recover ₹12.98 Crore Following Favourable APTEL Order
Copyright 2026 — SolarScope India. All rights reserved. SolarScope India.