Skip to content
  • https://www.facebook.com/
  • https://twitter.com/
  • https://t.me/
  • https://www.instagram.com/
  • https://youtube.com/
SolarScope India SolarScope India SolarScope India

Digital Media & News for Renewable Energy

SolarScope India SolarScope India SolarScope India

Digital Media & News for Renewable Energy

  • Home
  • About us
  • Contact us
  • Event Calendar
  • Magazine

Menu

  • Energy Storage
  • Green Hydrogen & Green Ammonia
  • Renewable Energy
  • Wind Power
  • Solar Manufacturing
  • Solar PV
  • Sustainable Transport
  • Power Transmission & Grid
  • Appointments
  • Investment
  • Certifications
  • Business
  • Government Policies
  • Tender
  • Instagram
  • Facebook
  • LinkedIn
  • Link
  • Home
  • About us
  • Contact us
  • Event Calendar
  • Magazine
Close

Search

Home/News/Tender/Pace Digitek Secures ₹92.93 Crore Order for 100 MWh BESS Project from Kalpa Power
img 7372
Tender

Pace Digitek Secures ₹92.93 Crore Order for 100 MWh BESS Project from Kalpa Power

By SolarScope India
August 24, 2026 2 Min Read
0

Pace Digitek Limited has secured a significant domestic order worth ₹92.93 crore for a 100 MWh Battery Energy Storage System (BESS) project, further strengthening its presence in India’s rapidly growing energy storage market.

The contract has been awarded to Lineage Power Private Limited, a material subsidiary of Pace Digitek, by Kalpa Power Private Limited (KPPL). The scope includes the supply and commissioning support for the 100 MWh BESS project.

According to the company’s disclosure, the project is scheduled to be completed by December 31, 2026. The order, valued at ₹929.25 million including GST, is entirely domestic in nature.

Pace Digitek also stated that its promoters, promoter group and group companies do not have any interest in Kalpa Power. As a result, the transaction is not classified as a related-party transaction and has been executed on an arm’s-length basis.

The latest order adds to Pace Digitek’s growing energy storage portfolio as India accelerates the deployment of utility-scale BESS infrastructure. Large-scale battery storage is increasingly becoming a critical part of the renewable energy ecosystem, supporting grid flexibility, improving the integration of variable solar and wind generation, and enabling more reliable power supply.

The 100 MWh project further underlines the expanding demand for advanced energy storage solutions in India and strengthens Pace Digitek’s position in the country’s evolving clean energy and grid infrastructure landscape.

Key Highlights

  • Order Value: ₹92.93 crore
  • Project Capacity: 100 MWh BESS
  • Awarded To: Lineage Power Private Limited, a material subsidiary of Pace Digitek
  • Customer: Kalpa Power Private Limited
  • Scope: Supply and commissioning support
  • Project Completion Target: December 31, 2026
  • Transaction Type: Domestic and arm’s-length transaction
Author

SolarScope India

Follow Me
Other Articles
img 7371
Previous

ReNew Energy Global Reports Strong Q1 FY27 Results; Net Profit Rises 16%

img 7373
Next

Enlight Metals Bets on Electrical Safety as India’s Power and Infrastructure Ecosystem Expands

Recent Posts

  • REMONDIS Aqua India Secures Water Treatment Package for Celloraa Energy’s 1.2 GW Solar Cell Facility in Gujarat
  • Ajay Jain Appointed Vice President at Siemens Energy India Limited
  • InSolare Secures EPC Order for 13.2 MWp Solar Project with 7.5 MWh BESS
  • Adani Enterprises and Jabil Sign Agreement for Proposed AI and Data Centre Equipment JV in India
  • CEA Releases 2026 Manual on Transmission Planning Criteria
  • ACME Solar Signs 300 MW Power Supply Agreement with SECI at ₹6 per Unit
  • Chennai Port Authority Invites Bids for 2 MW Rooftop Solar Project
  • Avaada Group Plans ₹40,000 Crore Investment in Green Ammonia and Methanol Projects
  • Greenzo Energy Raises ₹130 Crore, Valued at ₹1,030 Crore
  • Jindal Stainless Deploys Electric Trucks for the First Time, Strengthening Green Mobility
Copyright 2026 — SolarScope India. All rights reserved. SolarScope India.