Skip to content
  • https://www.facebook.com/
  • https://twitter.com/
  • https://t.me/
  • https://www.instagram.com/
  • https://youtube.com/
SolarScope India SolarScope India SolarScope India

Digital Media & News for Renewable Energy

SolarScope India SolarScope India SolarScope India

Digital Media & News for Renewable Energy

  • Home
  • About us
  • Contact us
  • Event Calendar
  • Magazine

Menu

  • Energy Storage
  • Green Hydrogen & Green Ammonia
  • Renewable Energy
  • Wind Power
  • Solar Manufacturing
  • Solar PV
  • Sustainable Transport
  • Power Transmission & Grid
  • Appointments
  • Investment
  • Certifications
  • Business
  • Government Policies
  • Tender
  • Instagram
  • Facebook
  • LinkedIn
  • Link
  • Home
  • About us
  • Contact us
  • Event Calendar
  • Magazine
Close

Search

Home/News/Solar Manufacturing/Premier Energies Commissions 7 GW TOPCon Solar Cell Plant in Andhra Pradesh, Total Capacity Reaches 10.6 GW
img 8169
Solar Manufacturing

Premier Energies Commissions 7 GW TOPCon Solar Cell Plant in Andhra Pradesh, Total Capacity Reaches 10.6 GW

By SolarScope India
September 21, 2026 1 Min Read
0

Premier Energies has commissioned a 7 GW N-type TOPCon G12R solar cell manufacturing facility at Naidupeta in Andhra Pradesh, expanding its total solar cell manufacturing capacity to 10.6 GW. The company has also commenced trial runs at the new facility, which it describes as India’s largest solar cell manufacturing plant.

Spread across 101 acres, the facility has been developed with a capital expenditure of ₹3,293 crore. Designed for high-throughput manufacturing, the plant can produce approximately 88,000 solar cells per hour. It incorporates digital systems and artificial intelligence for predictive performance analysis, process control and precision manufacturing, alongside automated material handling, packing and packaging systems.

The facility uses N-type TOPCon G12R technology and has been designed to accommodate future upgrades to next-generation TOPCon+ technologies, including poly-finger metallisation and advanced edge-isolation processes. Following stabilisation and ramp-up, Premier Energies is targeting an average solar cell efficiency of approximately 25.8%.

The plant also incorporates a Zero Liquid Discharge system aimed at maximising water recycling and reuse. According to the company, the new capacity will strengthen its ability to serve growing demand for high-efficiency solar products in both domestic and international markets.

The commissioning is part of Premier Energies’ broader manufacturing expansion strategy, which includes planned backward integration into ingot and wafer production and further diversification across the clean-energy value chain.

Author

SolarScope India

Follow Me
Other Articles
img 8170
Previous

Suzlon Energy Allots 6.4 Lakh Equity Shares Under ESOP 2022, Paid-Up Capital Rises to ₹2,749.26 Crore

9abe331e ada3 4bbc 8f26 4f420a001955
Next

Maharashtra Clarifies Renewable Energy & Energy Storage Policy Requirements

Recent Posts

  • Sembcorp Green Infra Receives SEBI Approval for ₹3,750 Crore IPO
  • Resonia Unveils New Vision, Targets ₹1 Lakh Crore Asset Portfolio by FY32
  • Advait Battery Ecosystem Appoints Bhushan Shahane as Chief Operating Officer
  • Tata Power Renewable Energy Commissions 100.8 MW Wind Project in Maharashtra
  • RERC Approves Five-Year PPA Extensions for Two 1.25 MW Wind Projects in Rajasthan at ₹2.44 per Unit
  • KKR Makes Minority Investment in Gentari’s 8 GW Renewable Energy Platform in India
  • Juniper Green Energy Commissions 108.50 MWp Solar Capacity and 94.77 MWh BESS
  • ACME Solar Signs PPA for 220 MW Solar + BESS Project at Morena Solar Park in Madhya Pradesh
  • Waaree Transpower Secures Transformer Order Worth Over ₹100 Crore from NTPC
  • Orient Green Power to Recover ₹12.98 Crore Following Favourable APTEL Order
Copyright 2026 — SolarScope India. All rights reserved. SolarScope India.