Skip to content
  • https://www.facebook.com/
  • https://twitter.com/
  • https://t.me/
  • https://www.instagram.com/
  • https://youtube.com/
SolarScope India SolarScope India SolarScope India

Digital Media & News for Renewable Energy

SolarScope India SolarScope India SolarScope India

Digital Media & News for Renewable Energy

  • Home
  • About us
  • Contact us
  • Event Calendar
  • Magazine

Menu

  • Energy Storage
  • Green Hydrogen & Green Ammonia
  • Renewable Energy
  • Wind Power
  • Solar Manufacturing
  • Solar PV
  • Sustainable Transport
  • Power Transmission & Grid
  • Appointments
  • Investment
  • Certifications
  • Business
  • Government Policies
  • Tender
  • Instagram
  • Facebook
  • LinkedIn
  • Link
  • Home
  • About us
  • Contact us
  • Event Calendar
  • Magazine
Close

Search

Home/News/Energy Storage/Trinasolar Supplies 3 MWp Solar PV and 10 MWh BESS in Vietnam
b84a82a6 091a 4368 97ed 556b9dcf6442
Energy StorageSolar PV

Trinasolar Supplies 3 MWp Solar PV and 10 MWh BESS in Vietnam

By SolarScope India
August 20, 2026 1 Min Read
0

Trinasolar has supplied a 3 MWp solar PV system along with a 10 MWh Trina Storage Elementa 2 battery energy storage system (BESS) for Corona Resort in Phu Quoc, Vietnam. The project has been developed by Nam Viet Green Energy JSC. 

The solar installation uses Trinasolar’s Vertex N 725W (NEG21C.20) modules, while the 10 MWh BESS is designed to improve energy flexibility and power resilience at the resort. The system is expected to be connected to the grid and begin commercial operations in mid-September 2026. 

Key Highlights

  • ☀️ 3 MWp solar PV system
  • 🔋 10 MWh Trina Storage Elementa 2 BESS
  • 📍 Corona Resort, Phu Quoc, Vietnam
  • ⚡ Vertex N 725W n-type i-TOPCon modules
  • 🏗️ Developed by Nam Viet Green Energy JSC
  • 📅 Commercial operations expected by mid-September 2026
  • 🌱 Supports renewable energy integration, peak-demand management and power resilience 

Vietnam is targeting 10,000–16,300 MW of BESS capacity by 2030, highlighting the growing importance of solar-plus-storage projects in the country’s energy transition. 

Author

SolarScope India

Follow Me
Other Articles
img 7322
Previous

Mahindra Susten Secures ₹875 Crore Financing for 150.80 MW Hybrid RE Project

img 7324
Next

KPI Green Energy Energizes 130 MW AC / 195 MW DC Solar Capacity in Gujarat

Recent Posts

  • REMONDIS Aqua India Secures Water Treatment Package for Celloraa Energy’s 1.2 GW Solar Cell Facility in Gujarat
  • Ajay Jain Appointed Vice President at Siemens Energy India Limited
  • InSolare Secures EPC Order for 13.2 MWp Solar Project with 7.5 MWh BESS
  • Adani Enterprises and Jabil Sign Agreement for Proposed AI and Data Centre Equipment JV in India
  • CEA Releases 2026 Manual on Transmission Planning Criteria
  • ACME Solar Signs 300 MW Power Supply Agreement with SECI at ₹6 per Unit
  • Chennai Port Authority Invites Bids for 2 MW Rooftop Solar Project
  • Avaada Group Plans ₹40,000 Crore Investment in Green Ammonia and Methanol Projects
  • Greenzo Energy Raises ₹130 Crore, Valued at ₹1,030 Crore
  • Jindal Stainless Deploys Electric Trucks for the First Time, Strengthening Green Mobility
Copyright 2026 — SolarScope India. All rights reserved. SolarScope India.